Friday, March 29, 2013

Scanning Electron Microscope


      ESEM Operation Manual

Last update: March 29, 2012 by Prashant Patil

You should be trained before you use this machine. Please email prashant.patil@cba.mit.edu for training information

Machine name : Environmental Scanning Electron Microscope                    
Model : Phillips XL-30 (S/N D1513)

Contact: Prashant Patil         prashant.patil@cba.mit.edu         617-758-9402



Note - 
- Always vent chamber with nitrogen. If vented with air, overtime chamber will get really dirty. If the chamber is really dirty then during high resolution imaging say for gold nanopaticles, at higher resolution there will be carbon deposition and the image will blur out so you will never be able to image at higher resolution
- IMPORTANT : Keep venting pressure at 5psi. Because its such a low pressure, its ideal to have a separate nitrogen cylinder for SEM.
- The idea pressure inside the chamber is in 10^-6 to 10^-5 range. In my system, may be because of leak the pressure is just about 3.2x10^-5, this creates problem during high-resolution imaging.

Machine Overview

This machine is equipped with electron beam column. This allows electron microscope imaging. As an additional function, ESEM mode can be selected which injects water molecule into the chamber for low vacuum(compared to conventional high vacuum environment) observation.
A separate patterning system is available.(NPGS, Nano Pattern Generation System) This function overrides beam position control, so draws predefined patterns for e-beam lithography.

Emergency Action

- Turn off the beam
- Vent the chamber
Note
The red ‘OFF’ button on the front panel shuts down all machine parts, requiring days of re-alignment and, possibly, lot's of service charge. Refrain from operating the front panel buttons(ON, OFF, STBY) unless you are in maintenance position.


Quick manual

1. Turn off the beam.
2. Vent the chamber.
3. Load your sample.
4. Pump the chamber.
5. Turn on the beam.
6. Do your process.
7. Turn off the beam.
8. Vent the chamber.
9. Remove your sample.
10. Pump the chamber.

ESEM-System


ESEM-Software

Details

On the control software, there are four boxes on the right side. From the top, vacuum control box, beam control box, video control box and stage control box.(The official name can be different. However, these would be the names in this manual.) By default, each box shows minimal controls. On the top right of each box, there is an expansion button which shows all detailed controls. After completion, contract the detailed box by selecting the expansion button again.

1. Sign Instrument Log Sheet

Before using the instrument, please sign the log sheet. Also please don't forget to report any error if observed at the end of the session.

2. Turn off the beam

- Turn off high tension button.(it is numeric(e.g. 10kV) button in beam control box, not the hardware button on the front control panel) Yellow fill is on, and gray is off.
- In the ‘Detectors’ menu, choose ‘CCD’. Chamber will be shown.
 

3. Vent the chamber

- Open nitrogen cylinder (~40psi)
-
Open the purging valve located near the water pipe line
- Click ‘Vent’ button in vacuum control box.
- Click ‘OK’ at the confirmation dialog box.
- Wait 3~5min and gently pull the chamber handle.
- Close the purging valve and nitrogen cylender

4. Load your sample

- Place proper stub and carbon tape on it.
- Attach your sample.
- Place height standard beside the stub.
- Raise the Z height to 10mm point.
- Option1: Rotate Z dial to desired point manually.
- Option2: Put desired number in the ‘Z’ value of stage control box.
  (Note : Pay special attention when your sample is not planar, or too large. Above 10mm point, it may touch or break machine parts.)
- Make a rough sketch of the sample location w.r.t. the stub center.
- Close the chamber and make sure it doesn't collide with e-beam column.

5. Pump the chamber

- Click ‘Pump’ button in vacuum control box. Push and hold the chamber handle for about 5 seconds.
- Wait until chamber pressure drops below 1.3e-4 mbar showing ‘Vac OK’. (The indicator changes ‘pumping’
à ‘pre vac’ à ‘vac ok’)

Note - Some times following error will appear "Leakage in chamber", just click ok in error box and press 'Pump' button again.

6. Center the stage

This feature is currently disabled, proceed to step 7
- Maximize the stage sub-menu in the left of the screen. You will see the box with a
x sign. The x sign indicate the position of the center of the sample stage and the center of the box is the e-beam position.
- Change the detector to ‘CCD’ and double click at the center of the box. This will move the center of the stage just below the e-beam. The motion of the stage can be seen in the monitor screen.

7. Turn on the beam

- Change the detector(in the menu) to ‘SE’
-Select the beam acceleration voltage, click the beam control expansion button. For normal imaging, start from 10kV and spot 3, and adjust if necessary. Lower voltage is used for fragile samples like biological samples and Higher voltage is used for better resolution. The max resolution can be achieved by selecting 30kV and 1 spot size. At lower spot size, there is low current and its less damaging. However it has low signal to noise ration.
- Field emission gun is always on. So you only have to click high tension(the numeric button) in beam control box.
- A message window will appear “Microscope confirm Focus Box with text “For safety reason …...”. Do
NOT click OK. First, focus the image to get the sharp image and then click OK.

7. Do your process

- Imaging
1) Select ‘TV' fro Scan menu
2) Focus your image by mouse left-right motion while holding right mouse button down.
3) If necessary, adjust astigmatism by mouse motion while holding SHIFT + right mouse button.
4) Change contrast and brightness in the video control box.
5) Change magnification by “+” and “-“ keys in keyboard.
6) To move stage, choose proper method in the toolbar. Crossmark(+) allows center position movement by double click. Drag(O-) function allows drag-movement toward mouse pointer position. Or, you can directly insert numeric coordinate value in the stage control box and press enter.
7) To save an image, do either of these actions first
 - Freeze current live image by deselecting ‘live’ button, or
 - Press ‘F2’ button to make a single grab
- Go to In/Out menu -> Image
 Then, go to ‘XL docu’ program window.(if not activated, launch the icon in the desktop.) In the toolbar, click grab button(camera icon), and save the image to the desired folder.

- Patterning
1) Move to the desired position
2) Change beam conditions(acceleration voltage, spot size, focus, magnification…), then blank the beam.
3) In the ‘scan’ menu, choose ‘”External XY”.
4) Go to NPGS pc, and choose your desired RF6 file in the NPGS software.
- Note: you must prepare dc2 and corresponding rf6 files in advance.
5) Click “Run process”.
6) As instructed in the command line, press any key to proceed.

8. Turn off the beam

- Select lowes magnification by going to Magn. menu -> 200
- Turn off high tension in beam control box.
- Change the detector to CCD.

9. Vent the chamber

- The same as instruction 3.

10. Remove your sample

- Carefully remove your sample. Usually, new carbon tape is very sticky. Be careful not to break your substrate.

11. Pump the chamber

- Click ‘Pump’ button in the vacuum control box.
- Leave the machine pumped down.


Additional references

Patterning

 NPGS system uses propriety Design Cad 2000 file for patterning. This is compatible with vector based graphic files like “.DXF”. In convention, 1 unit corresponds to 1 um.

1. Import “.dxf” file in Design Cad

- To launch Design Cad, go to NPGS software. Choose any *.DC2 file and click ‘Design Cad LT’ button on the left.

2. Edit the entities

- Line type change
- Select the entity to modify
- Change line type
- Dashed line(filled entity): line 1(serpentine) or line 5(one direction)
- Solid line(outline): line 0
- Click “apply to selection” button
- Drawing order change
- Go to menu, NPGS
- ‘Order check’ – shows the drawing order information
- ‘Order entity’ – changes the order of drawings
- Sometimes, features like circle may not be reproduced well. In this case,
- Select the entity to modify
- Go to menu, Edit
- ‘modify selection’ – ‘vector convert’
- Click “apply to selection” button

3. Save the file into DC2 format by “NPGS-SAVE-SAVE TO CURRENT NPGS PROJECT”.


4. Make a new RF6 file(or copy old one, rename and edit it.)

Insert necessary number of entity(normally 3)                                              
- right side window : Y/N/Y/Y/N                       
- 1st entity(batch process for unblanking the beam)                                      
- type : command                                  
- mode : batch(dos)                              
- pause : before only                            
- command name : unblank                              
- right side data : \NPGS\Projects\pg_fei 63il, 0, 0.2               
- 2nd eneity(drawing pattern)                                                 
- type : pattern or array                      
- name : assign DC2 file name                           
in case of array                     
    -  # of rows and columns :                   
    - initial XY move to pattern center : assign pattern center. This point is center for overall array.          
    -  array spacing : spacing(there is no clear rule. It is recommended to assign (+,-)  
- Right window layer data                                  
    - layer : assign activity(normal writing or skip)           
    - magnification : synchronize with SEM mag.(normally, 1000x)          
    - center to center distance / line spacing: you can assign or use default        
    - measured beam current : using picoammeter, read the current value(spot 1) and write down. 
    - dwell : choose line or area dose and fill the value.                
    - For PMMA, areadose ~100uC/cm2 and linedose 0.3-0.5nC/cm
- 3rd entity (blanking)                                                   
    - type : command                                  
    - mode : batch(dos)                              
    - pause : never                       
    - command name : blank                    
    - right side data : \NPGS\Projects\pg_fei 63il, 1, 0.2               
    - in the manual, you can find all kinds of command names.                  

5. Run “.RF6” as instructed in process 6



ESEM mode

For ESEM mode, make it sure water bottle contains enough water and auxiliary pump is connected to the power securely. The pump is normally off, and starts to operate when ESEM mode is engaged.
ESEM-Auxulrypump
1) Prepare wet body insert, insertion/removal tool and GSED. They are stored in the black case named ‘spares kit esem’ in the shelf.


ESEM-tools

2) Open the chamber and remove previously installed high vacuum insert using insertion/removal tool.
image10


3) Install wet body insert. DO NOT TIGHTEN TOO MUCH.
4) Install GSED.
ESEM-GSED


5) Place your sample and vacuum the chamber.

6) Expand vacuum control box.
Select H2O in ‘mode’ selection. Click ‘ok’ in the dialog box.
Adjust the ‘pressure’ slide bar to about 2.5 Torr.(or your own value)

7) Click “Pump” button.

8) Do your process when ‘vac ok’ appears.

9) After process, remove ESEM accessories and replace with the original configurations.
 

Notes and maintenance


1. System shut-down

Sometimes, system shut-down or reboot is a good solution for electronic malfunction. There are three different types of them.

a. PC reboot
This only reboots PC, not the physical system. Therefore, it is a safe. When you face a malfunction, try this first.
- Turn off high tension.
- Close all the programs.
- Reboot PC.
- After booting, operate ‘Microscope Control’ in the desktop.
- Initialize the stage.
- Depending on diffusion pump condition, you may need to go through regular pump procedure, cooling-disabled-heating-idle-pumping.

b. Standby
This shuts down PC and peripheral electronic controls of ESEM. Essential electronics like beam control are still on. If ‘a’ does not heal the problem, standby is a doable option.
- Turn off high tension.
- Click ‘filament off’ button in beam control box.
- Vent the chamber.
- Close all the programs.
- Shut down Windows.
- When “Now it is safe to turn PC off” message appears, press ‘Standby’ button once. It takes about 5~10 seconds before the system turns off. Wait! Don’t press the button twice.
- To restart the system, press ‘ON’ button once.
- After booting, operate ‘Microscope Control’ in the desktop.
- Initialize the stage.
- Start regular pumping procedure.
- Click ‘start gun’ button in beam control box.

c. Complete shut-down
This shuts down all the systems including beam control. Not recommended. You may need to start from bake-out process.
 

2. Vacuum level

Due to unknown reason, ESEM vacuum is not great. It typically reaches around 3*10^-5 mbar, but no below this level. For normal operation, this is fine. However, for column vacuuming(like FEG replacement), this is problem since IGP only works below certain pressure. To tweak IGP, use metallic wrench and attach it to the magnetic pressure gauge. Then, the bake-out works. FEI engineers already know this. Typically, you may not face this situation.

3. Pump maintenance

There are two rotary pumps and one diffusion pump.

1) Rotary pump
Following is rotary pump oil change procedure.
- Place the pump on a raised surface. This is because drain plug is located near the bottom.
ESEM-rotorypump

- Using empty bottle and funnel(stored near the cuby hole entrance), drain the old oil. After drain, fasten the drain plug again.



ESEM-image09

- Open the top plug, and fill up flushing oil. Close the plug.
- Operate the pump for about 15 minutes.
- Drain the flushing oil in the same way.
- Fill up the oil chamber with high vacuum oil
è We typically use Edwards, ultra grade 19 oil.
- Close the plug, and re-install the pump.

a. Auxiliary pump is only used for ESEM mode. Since the usage is very minimal, pumping oil may not need to be replaced frequently. However, oil degrades as time. At least, change it every 2~3 years.

b. Main roughing pump is always on, so must be replaced at least once a year. Before removing roughing pump, vent ESEM chamber to deactivate diffusion pump.


2) Diffusion pump
It is unclear what the lifetime of diffusion pump oil is. We only refills the pumping oil once it is not enough. The procedure is:

- For safety, turn the system into standby.
- Wait until heating plate of diffusion pump cools down. It will take about 30~60 minutes.
- The pumping oil(Santovac 5, Monsanto) is very viscous, so hard to pour. Therefore, in the mean time, heat the oil.
ESEM-DPoil
- Open the refill cover.
ESEM-refillcover

- Using the attached gauge(a stick), check the oil level.
- If oil is not enough, pour proper amount of oil into the refill hole. FYI, oil capacity is 60cc.
- Close the cover firmly, and start the system.

3. Image fade
This tool has chronic symptom of image fading. The reason is unknown.
Description: Screen suddenly fades during imaging or blank. You can see only gray screen with almost zero contrast. If you see carefully, the feature outline is shown, but it is impossible to get a meaningful image.
Effect: This is believed to coming from image processing flow. Except imaging, all other functions including vacuum and beam control are fine. For example, even though the screen fades, ebeam writing works just ok.
Solution: There is no fundamental solution. However, we found that, when this happens, unplugging and plugging X6 coaxial cable generally solves the problem.
ESEM-X6connection
4. Stage tilt
ESEM has motorized stage for X,Y,Z,R direction. However, tilt must be done manually.
Before tilt, change the detector to CCD to see the physical condition to prevent accidental touch. While holding tilt handle, loosen tilt lock. Tile the stage as you desire, then lock the stage again.
ESEM-state
5. Pico ampere meter
Pico ampere meter is connected to the stage to read incoming current.

6. Field emission gun, ion source replacement
Electron beam sources must be replaced by FEI engineers.
Field emission gun(FEG) is always on. So, its lifetime is somewhat predictable. Typically it lasts 2~3 years. When FEG is first installed, emission current is typically less than 200 uA. If you don’t adjust extractor voltage, end-of-life FEG shows about 330~360 uA. Since this emission can be adjusted by extractor to some extent, this numbers are not very precise. However, it gives rough idea.

Supplies

1) Carbon tape to mount sample into stub (product# 16084-1) can be bought from here 
2) Special high purity tape for EDAX (product# 16084-4) can be bought from here


System Maintenance Log

1) Date - 02/09/12
    Problem - Vacuum Error
Description - The machine was not able to create vacuum in the sample chamber. There was repeated cycle of cooling, heating and electron gun turned off after some time
Remedy - I suspected its due to low level of vacuum oil in the diffusion pump and the problem was fixed.
2) Date - 02/10/12
Problem - Monitor was not able to turn on (no power supply)
Description - When the system was turned on after the ‘system Ideal state’. The computer of the PC turned on but not monitor. I changed the monitor and new monitor worked. I took some images with the system.
3) Date - 02/11/12
Problem - The following error was in the screen when I came to the lab
ESEM-error1sign
I tried to restart the software, but I didn’t because during the software start, it checks for all the error and It got stuck at ‘PLCB’ checking.
ESEM-error2sign

Wednesday, March 27, 2013

Elemental Analysis using EDAX

<<< Draft >>>

EDAX stands for Energy-dispersive X-ray spectroscopy and is used for elemental analysis. A high energy beam of electron is allowed to fall on sample (usually inside electron microscopes such as SEM). The interaction of incident electrons and the atoms results in generation of characteristics X-ray depending upon the energy level of electrons in the sample atoms. These X-ray is then analyzed to detect the elemental content of sample under study.

In my DualBeam focus ion beam system, I have an EDAX system installed. It looks like this



For EDAX special high purity carbon tape is used to mount specimen in stub. These can be bought from here (part number - 16084-4)


Monday, March 25, 2013

DIY Immertion Sample Liquid Helium Cryostat

Connector for the cryostat


http://www.mcmaster.com/#circular-electrical-connectors/=m1dxr3


The liquid helium cryostat of pipe size - 2 (2.38") pipe opening.


Feedthrough for liquid helium Dewar 

Outer diameter - 3" = 77.3mm
Thickness - 3mm
Diameter if pipe - 0.840" = 21.34mm
Ordered pipe from -


Start Your Research

Sample Labeling

I am using, brother P-touch PT-18R label maker for labeling my sample boxes. This label maker can be connected to computer and there are many label templates available that you can use with this label maker. Before connecting the label maker to your computer make sure to install its software first which can be downloaded from here


I prefer to keep my samples in small boxes which can be bought from here -

http://www.tedpella.com/storage-boxes-bags_html/styrene-boxes.htm

product number - 139-17

To label with multiple line go to A/F->Block Layout->3/4" (or different tape width)->1+5

Sample Numbering -

I prefer to number sample as -number in that lot, I also write addional information about the sample
and most importantly date of fabrication of sample.

To group similar samples and keep them together I use a big box inside which all the small samples perfectly fits. 
This box can be bought from here (product number - 139-25)

http://www.tedpella.com/storage-boxes-bags_html/styrene-boxes.htm

To keep sample in vacuum you can use desiccator which can be bought from here

http://www.amazon.com/Bel-Art-Scienceware-420270000-Polycarbonate-Desiccator/dp/B002VBW9SM/ref=zg_bs_393238011_8


Tools You will Need Often

1) Digital Caliper


Ordering Parts

Good source of mechanical parts is McMaster. Its usually a good idea to open the 3D cad file provided at macmaster website to get a feel of how the parts will look like. I keep a scale with me all the time to have a feel of how big the part will be. You can download the free eDrawings software from Solidworks which lets you open the CAD file from the McMaster website.

10mm Tee for glove box
10mm tube fitting valve for glove box




Lab Supplies 

- Nitrile gloves





lap join for dielectric spectroscopy, PFA Tee for dielectric

ANSI flage for LN2 in vacuum chamber, 1/4inch plug


Sunday, March 24, 2013

Plasma

For one of my experiment, I need to create oxygen plasma. This post is about creating oxygen plasma


Introduction 

Plasma is one of the fundamental state of matter when molecules exist as ions. Plasma is created in low pressure typically of the order of 0.2mbar by applying high DC, AC or Rf voltage. In the plasma state O2- and O- ions are formed.

Experiment

For creating plasma, I am using a vacuum chamber of my thermal physical vapor deposition system. I will connect a oxygen cylinder to the vent port of the system to introduce oxygen into the chamber. I will use a flow controller or regulator to control the flow of oxygen. I am planning to use a pure aluminum wire which will act as electrode. Since the voltage for creating plasma is hazardous, I am going to use a interlock which will disable the plasma supply whenever I will open the chamber. This will prevent me to accidentally touch active wire antenna.

1) Aluminum Electrode

I am planning to use 99.9% pure aluminum wire of diameter ~1.5mm as plasma electrode. I am ordering it from here

http://www.sigmaaldrich.com/catalog/product/sial/310360?lang=en&region=US

Another source of getting pure Aluminum electrodes/wires etc is -

http://www.americanelements.com/aluminum-electrode.html

Another source of ordering Al rods is -

http://www.espimetals.com/index.php/online-catalog/824-Aluminum%20%28Al%29,

I am planning to order 0.5" rod.

2) Power Supply

There are three ways to create plasma, one is DC plasma where you need to apply high DC voltage, other is apply AC high voltage and the third is to apply Rf power. First, I will try DC plasma then AC plasma.

For creating plasma, + of the power supply is connected to anetena (or metal electrode) and ground is connected to the vacuum chamber. I am not very confident at this stage to connect one terminal of AC to vacuum chamber so first I will try DC voltage, were connecting the ground to chamber is much more safe. For power supply, I am using PS350 high voltage power supply system from stanford research system. (http://www.thinksrs.com/products/PS300.htm). After being successful with this, I will also try other much cheaper high voltage transformers.

Working with High Voltages -

WARNING

High voltage cables can store charge if they are disconnected from the supply while the high voltage is on. The charge on the cable can cause injury or damage even after the cable is disconnected from the unit

Please make certain that the high voltage is completely discharged before changing the cable.

There are special type of cables called "High Voltage Cables" which should be used instead of normal BNC when working with high voltages. These cables mate with special connectors designed for high voltages only. These are MHV connectors and SHV connectors. Note that MHV connectors looks similar to BNC connectors but should not be confused with.

For high voltage cable I am ordering this one -

http://fieldcomponents.com/SHVP-RG58-SHVP-Length.html

Another option is from Kiethly , this one

http://www.keithley.com/products/accessories/cables/?mn=248-SHV

I will also need a BNC to male SHV connector

Source yet to find.



Tuesday, March 19, 2013

Thermal Physical Vapor Deposition

Introduction

In physical vapor deposition system, material is deposited on to the desired substrate. There are many ways by which one can do this, most used one are thermal vapor deposition or sputtering. Here I am going to discuss thermal vapor deposition.

At certain temperature every material changes into vapor state. These vapor can then be deposited into any substrate of choice. For example aluminum (Al) melts at 933K and evaporates at ~2800K. These vapors can then be deposited into substrate which is kept at  much lower temperature. For heating the metal usually Tungsten heaters are used. When very high current is allowed to pass through Tungsten it heats up. Tungsten is used because of its low electrical resistance (52nohm.m), high melting point (~3700K). These Tungsten heaters are in the form of boats to hold the melted metals. In my system, I use a 5V power supply capable of providing very high current. My system is described below

Statement of Operation of the my tool is at the end of this document and can be useful to understand how these systems work.

Depositing Metals 

1) Lead (Pb)
Its fairly easy to deposit lead as it melts at 600K and evaporates at 2022K. Tungsten (W) boat can be used for evaporating lead as it does not form ally with Pb

For measuring thickness, the system use a quartz crystal who's resonant frequency changes as metal deposit on it. This change in resonance frequency is used to calculate the thickness of deposited metal. Since each metal has different frequency, one need to specify this into the thickness meter to correctly calculate the thickness of corresponding metal. The parameters for all the metals can be found out in the "Thickness monitor manual". For Pb these parameters are -

Density - 11.3
z - factor (acoustic impedance) - 7.81
Tooling factor - 1.0
(this should be determined by first actually calculating deposited thickness and then back calculating tooling factor. For now, I am just using 1.0)

In thickness monitor system, I have set layer 8 for lead, were all this parameters are already entered.

2) Aluminum (Al)

Aluminum wets the tungsten and make alloy so usually alumina coated tungsten boast is used for Al deposition. However, because alumina causes thermal resistance usually 20%-50% more power is required to melt Al than using only tungsten boat.

First, I tried alumina coated tungsten boat and only when I use the boat for the first time I could manage to get 0.1nm/sec deposition rate at 13A, however increasing the current to 14A will cause the circuit break then power supply will shut off. Using the second boat for second time did not even gave 0.1nm deposition rate at 13A and it used to get circuit break if I try to increase the current to 14A. So I concluded that my system simply can not provide enough power to deposit aluminum using alumina coated boat.

Next, I tried tungsten boat. At around 10A the aluminum melted. The moment aluminum melts it wets the boat decreases the resistance of the boat and which cause sudden decrease in the boat temperature (I could see the glow stops when aluminum melts and the recover in 2-3sec). The melted aluminum keep on flowing over the boat covering entire boat. The deposition rate was first 0.5nm/sec which decreased to 0.2nm/sec possibly because all the alumina wetted the boat and there was nothing to evaporate.I further increased the current to 12A and could see increase in the deposition rate. I used 2 pellets and was able to deposit 88nm thick aluminum. I hoping since my boat is already wet with aluminum now, next time when I will use the same boat I will be able to deposit more aluminum.


Shadow Mask

I am making shadow mask for myself so that I can make many devices per lot without manyally sticking all  sample substrate with the sample holder. For this I am using 0.050" thick stainless steel sheets. I will water jet cut windows in this laser cut sheet for mask. I am buying the sheet from McMaster product number - 1773T15. For mask I will order a laser cut or etch mask which will be sandwiched between these to stainless steel sheets. Sample size is (12.3,13.16).

Size of center hole - 6.5mm
Side hole size -4.0mm
Thickness of mask sheet - 0.006" stainless steel


Metal Evaporator Operation Manual

Last update: March 19, 2013 by Prashant Patil

You should be trained before you use this machine. Please email prashant.patil@cba.mit.edu for training information



Machine Overview

This machine can evaporate metal under high vacuum while measuring the thickness by quartz crystal microbalance. Up to four different materials can be loaded in one batch. Since its thermal nature, metals with relatively low melting temperatures are more reliable. Following is verified list.
Reliable deposition: gold, silver, aluminum, copper
Marginal deposition: chrome
Very tough control: titanium
Unsuccessful: platinum
All the metals are stored in the nitrogen box beside the refrigerator.

Procedure

Let’s assume the machine is in vacuum status.

PVD-system 

1. Check nitrogen cylinder open. Check source control ‘off’. Check current dial ‘zero’. Then, press ‘vent’ button in the control panel.
You can hear hissing sound. Venting takes less than 2~3 minutes.
2. Open the chamber door using handle. If venting is completed, the door opens without any resistance.
After open, press ‘seal’ button in the control panel. This stops nitrogen supply.
PVD-Chamber
3. Relocate the venting port plug.
During venting, port plug pops out as shown in the picture. If contaminant goes into the venting hole, that may interfere the valve operation. Therefore, relocate the port plug right after the chamber opening.
PVD-SampleHolder
4. Attach your sample to the sample holding disk.
Kapton or carbon tape is convenient to use. However, if it is exposed to the high temperature source for a long time, the sticky adhesives remain residue. In such a case, use screws and clips instead.
5. Plug the rod of sample holding disk into the slot. Then, the sample is facing down toward the source as shown in the picture.
6. Install the boat and put metal pellets.
                    Loosen the knuckles and install the boat. Put 1~2 pellets.
                    Using source selector, adjust the boat position.
                    Adjust electrode arm position. It must make a intimate contact to the knuckle body.
7. Close the chamber, and press ‘cycle’ to vacuum the chamber.
                    Typical operation vacuum is <2 1="" about="" e-6="" hour.="" it="" mbar.="" span="" takes="">
8. Pressing ‘data’ button changes the indication mode from rate to layer, density…… Go to ‘layer’.
9. Choose the layer(preset of material properties) according to your metal source using arrow buttons.
Currently, 1-Au, 2-Ti, 3-Cr, 4-Al, 5-Pt, 6-Cu, 7-Ag.
10. After choosing layer, press ‘run’ button twice.
                    Whenever pressing ‘run’ button, the status changes between ‘close’ and ‘open’. By pressing twice, it will switch ‘close’à’open’à’close’. This resets the thickness monitor to zero.
                    The ‘open’ and ‘close’ only mean the thickness monitor(QCM) operation. It is not synchronized with physical shutter.
11. Once pressure reaches operation condition, put source control ‘on’ (Man - manual)
12. Gradually increase the current using current dial while seeing the source boat through the window.
                    The number in dial is fake. Only read the current meter.
                    Typically, you can see the boat glowing at around 8 in the current meter. Up until this point, you can increase the current quite fast.( in about 10~20 seconds)
                    From 8 point, be patient to watch out the status of the metal. Low melting point metal start to melt around this point. If properly melted, the liquid swirls in the boat. If it does not melt, increase the current slightly(about 1~2 each time) and watch.
                    It is good to memorize typical operation point of the metal. In my observation, gold and aluminum melt around 10~12.
13. After seeing stable swirling of the metal source, open the shutter by shutter handle and press ‘run’ button in the thickness monitor simultaneously.
14. See the deposition rate in the thickness monitor. Adjust current dial to desired deposition rate.
15. When desired thickness reaches, close the physical shutter first, then press ‘run’ button to close the QCM.
16. Decrease the current using dial.
                    Decrease into half, wait about 30 seconds. Repeat these cycle 2~3, then put the current zero.
17. Turn the source control ‘off’.
18. Cool the substrate at least 15 minutes.
                    If opened immediately, metal film may delaminate.
19. Vent the chamber and remove your sample and metal source.
20. Vacuum the chamber.
Metal Pellets stock
Al, Sn, Au, Ni, Cr, In, Ti, Ag, Zn,Pb
Boat Stock-
In


Notes

1. Aluminum foil cover

                    All inside wall of the chamber and shutter is covered by aluminum foil. Regularly, replace this aluminum foil. Otherwise, detached metal flakes may contaminate the chamber.

2. Cleaning

                    Regularly, clean the chamber with cleanroom vacuum cleaner. Especially, remove metal flakes thoroughly. They frequently stick to valves/sealing degrading vacuum quality.
PVD-Windows

3. Windows shield

Window is shielded by a couple sheets of slide glass. Regularly replace these slide glasses. Otherwise, it is very hard to see the inside through the window.

4. Door rubber sealing

                    Regularly clean the rubber sealing of the chamber door. First, swipe the sealing with IPA soaked wiper. Clean and dry thoroughly. Then, spread a small amount of high vacuum grease(Dow Corning).
PVD-QCM replacement

5. QCM replacement

                    Using ‘data’ button in the thickness monitor, go to ‘usage’. This indicates the usage of QCM. When new QCM is installed, this value is around 20. Do not exceed 100.
                    If QCM needs replacement, pop out the holder.(Then, thickness monitor automatically turns off.) Remove old QCM and install new one as shown in the picture.(electrode on top) Plug in, then you can see the thickness monitor on again.
                    QCM is sold in many venders including Fil-Tech and Maxtek.(ex. Maxtek P/N 103200-2)

6. Metal boat

                    Typically, tungsten boat is used. Order them to Kurt J. Lesker.
Tungsten Boat - P/N-EVS2B015W
Alumina Coated Tungsten Boat - P/N-EVS2BAOW
For the following materials, use alumina coated tungsten boat instead.
Aluminum: It easily wets tungsten boat.
Chrome: It forms alloy with tungsten.
PVD-circuitbraker

7. Circuit breaker

                    Circuit breaker locates just above the turbo pump control unit. The breaker trips when too large current is drawn, or the circuit is shortened. In such a case, press the white button. It is unclear the roles of other two buttons.

8. Pump maintenance

                    In case of roughing pump, change the oil regularly. Typically once a year.
Turbo pump needs cooling. Regularly check the coolant/chiller. However, even if the chiller fails, turbo can be operational under proper air cooling. Install a fan and leave the cabinet door open.

9. Manual control

                    The machine parameters can be manually controlled by hidden menu. Press ‘no’ button in control panel. Then, you can see several submenus by arrow button. Pressing ‘yes’ selects current indication.
                    -Sequence run => default screen
                    -Set point
                    -Manual mode
                    -Adjust mode
                    -System ID
                    Using Manual mode, each valves/relays can be operated.

Chiller maintenance

Note:
The maintenance consists of two parts.
        - Circulation water refill
        - Recovery from dried-out status
        - Emergency operation during chiller broken-down

1) Circulation water refill

Interval: every week
Purpose:
Metal evaporator chiller is not well sealed. Therefore, the water loss is fast, which means weekly checkup required. The compressor is air-cooled. No need of external coolant.
Procedure:
1. Open the lid of the reservoir.
2. If water level is low, refill potable mineral water.

2) Recovery from dried-out status

Interval:
Purpose:
If the water reservoir remained below minimum level for a long time, the chiller is automatically turned off and put into standby. It must be recovered by resetting.
Procedure:
1. Refill the water first.
2. Push the red reset button on the right side of the unit.

3) Emergency operation during chiller broken-down

Interval:
Purpose:
This chiller frequently experiences compressor failure. During fixture, there is no circulating water. However, fortunately, turbomolecular pump of metal evaporator had run without chilling water making no problems. But, as a precaution, set up an air-cooling platform.
Procedure:
1. Open metal evaporator cabinet door.
2. Place a fan, and blow the air continuously until chilling water is recovered.


Fundametal of Network Analyzer

%%%%% draft %%%%%

Introduction

When getting signal from one point to other, we are most conserend about 

A Vector network analyzer measures both magnitude and phase.



S - Parameter Measurement Using Network Analyzer

Given a circuit or network with certain ports. A simplest circuit is the one with two port.


Fabrication of Inelastic Electron Tunneling Spectroscopy Devices

Introduction 

The device structure is Al-A2O3-Pb.

Substrate -

I am using glass as substrate for fabrication of IETS devices.

Cleaning of the substrate

First Lot of Fabricated Devices

Pb 500nm


Second lot of Fabricated Devices -
Date - 03/19/13

Fabrication Steps

Step -1 : Deposited 100nm Al on pre-cleaned glass substrate using thermal physical vapor deposition at 5x10^-6mbar pressure.
Step -2: The devices was in deposition vacuum chamber for around 12 hours. The devices was than exposed to air for 6 hours for growing Al2O3 which will act as tunneling barrier. For doping tunneling junction, Acetophenone was spin coated on grown Al2O3 at 6000rpm.
Step -3: 100nm of Pb was deposited on cross electrode geometry using thermal physical vapor deposition system. The devices were kept in vacuum chamber for around 1 day.

The resistance between two terminal of one of the electrode was infinity making these devices useless. Possible reason of this could be that the thickness of the electrode were too thin (~100nm). I am not sure which electrode was showing infinite resistance but I suspect its mostly Pb electrode.

Calculation for resistance of the electrodes

Lead Pb:
L = 6mm, b = 1mm, t = 100nm  and p = 208nohm.m so calculated R = 12ohm

Aluminum Al
L = 6mm, b = 1mm, t = 100nm  and p = 28nohm.m so calculated R = 1.6ohm

Cause of failure - I am assuming its because of the thickness of the Pb electrode. At the junction, there could be discontinuity because of the step at the junction area (the thickness of the Al/Al2O3 at device area is 100nm+ ). Since the height difference is more ~100nm+oxide thickness and Pb deposited height is around 100nm, there could be discontinuity at the junction in Pb electrode. Another reason could be that because of small thickness of the electrode, indium in not making good contact.

I am gonna fabricated another set of devices with this time electrode thickness of ~200nm for Al and 500nm for Pb. I am also gonna check the resistance of the Al electrode to make sure which metal electrode is showing infinite resistance.

Third LOt of Fabricated Devices -
 03/21/13

This time, I deposited 80nm of Aluminum using Tungsten boat (as alumina coated Tungsten boat was giving me hard time). After ~1hour, I opened the chamber and removed the devices and checked its device resistance. The resistance of the aluminum lead was 67ohms. I immediately changed the orientation of the device and kept it inside the chamber for Pb deposition. The time should be around ~10min so I just gave this much time for the oxidation of aluminum. After that I deposited 500nm of Pb. This time there was no infinite resistance of any lead so I concluded that previously the infinite resistance was shown by Pb leads and it was because of the discontinuity in the Pb electrod at the junction. The resistance of the Pb electrode was 21ohm. The resistance of the Pb electrode seems to increase with time. The device impedance could be of the order of 1ohm because when I applied 1mA current and used four probe method to measure the voltage, it was about 1.1mV.

Friday, March 1, 2013

Getting Driving License in Massachusetts

As an international student in MA, I am required to get a MA driving license in order to drive in Massachusetts. Most students apply for Class D driving license. In order to get your driving license, first you need to apply for "Class D Learners Permit". Once you have permit, you can drive provided you are accompanied by someone who is at least 21 years old and hold a valid Class D driving license.

Here are the steps to get your driving license -

Step-1: Go to http://www.massrmv.com/ and familiarize yourself with the rules and regulations. Its a good idea to go through the "Drivers manual" (link - http://www.massrmv.com/rmv/dmanual/Drivers_Manual.pdf). Be aware, there are many privately own website with similar domain names.

Have a look at massrmv online services -

http://www.massrmv.com/OnlineServices.aspx

You can apply for permit, schedule your road test etc in above page.

Step-2: Apply for Class D learners permit online here

https://secure.rmv.state.ma.us/prestageas/PST_IntroAndTermsAndConditions.aspx?Transaction=NewPermit

You will be asked for documents verifying your date of birth, signature and residency. Not that you can not use same document to verify two things. For example, you can not use passport to verify both date of birth and signature.

I selected following documents when asked

1) Date of Birth - Non US passport

You will be asked if you have I-94 and class of Visa. You will also need I-20 when you will visit the MASSRMV office.

2) Document providing signature - Social Security card

3) Proof of residency - Bank statements etc (no older that 60 days)

 You can also book an appointment before saving the document.

Step-3: Visit the office at your appointment time with following documents

1) Passport
2) I20
3) SSN Card
4) Bank Statement (no older than 60 days)
5) Completed Application Form

Remember to bring or wear your corrective vision lenses for vision test. You will need to give following tests

a) Class D Learner's Permit Exam
b) Vision Test

Step-4: Prepare for Class D Learner's Permit Exam

The exam consist of 20 objective type questions. You must score 70% (i.e. 14 correct answer) to pass the exam. The duration of the exam is 20 minute. The questions are asked from "Drivers Manual". You can download the copy of drivers manual from here.

http://www.massrmv.com/rmv/dmanual/Drivers_Manual.pdf

Its very helpful if you give some online test before appearing for actual exam. Some of the online test can be found out here

http://driving-tests.org/massachusetts/massachusetts-dmv-practice-test-3/


Step-4: Road test.

Fill the "Road Test Application" form which can be found here - http://www.massrmv.com/rmv/forms/21844.pdf

Or you can also apply online